A509 from Chicheley Hill Roundabout to the Junction of Emberton Village turning and Petsoe End Junction.
The A509 will be closed every night from the 20th Aug – Sunday night until the 26th Aug 2023 – the road will be open during the day,
Closure will be on from 16.00 pm to 06.00am
Works being carried out.
Street Lighting – up grade and improve the lighting in this location
Landscaping- vegetation clearing
Serco – street cleaning
White Lining – where required
Road surface repairs where needed
Structures to carry out bridge inspections
Straighten ,replace. clean bollards and signage within the closure
Clean and jet gullies all within the closure
Replace any jammed or broken gullies
Specialist high pressure Jetting crew with CCTV to Jet the French filter drainage system near Perry Lane Bridge
There will be a letter drop shortly to inform residents in Prospect place that access will be maintained to them but must follow guidance from TM crews exiting and returning to properties as this will be a live site
Advance signage will be going out in the form of
- 14 AWS to go out by 4th August
- 5 x VMS’s to go by 4th August
This is to give advance warning to road users of the road closure, this is already on https://one.network/ as well to give even more notice to road users
Hi I work at 6 Tanners Dr
Blakelands
Milton Keynes
MK14 5BN
England
Can I still use the Road when it’s the closure? Or I wouldn’t be able to?
Good afternoon Barbora
The road will be closed from 16.00 pm to 06.00am whilst the works are being carried out.
If you require further detail please check here. https://one.network/
Regards
Clerk for Sherington PC